Current Pond 50° F
Updated: 11.02.24

Search
Close this search box.

Newsletter August 2014

Recent Projects

 Kirkland Project:

These are great clients with a new construction home and garden. This is our third and possibly last expansion of the garden. We started out last year with an awesome waterfall and pond in the sunny part of the garden. The water feature starts with a three column bubbler then overflows into the stream/waterfall that runs 65 feet to the goldfish pond below. The second expansion was granite steps and plants in the sunny part of the garden.

This final portion is the shade garden. We installed a gas fire pit, large flagstone patio area, drainage, stone risers and outcropping stone, new soil, plants, and mulch. The only thing this garden still needs is outdoor lighting!

kirland01

Edmonds Project:

We installed a new Koi pond in this Edmonds garden. The pond is 10’x12’ and 4’ deep. We built up the hill for the waterfall and brought in new soil for the client to plant around the pond after we left. This pond includes a skimmer, up-flow filter, biological bead filter, UV sterilizer and underwater lights.

edmonds01

Kenmore Project:

This project is a design created by Rick. The plants chosen for the project are orange, fuchsia, and chartreuse with a bit of dark purple/burgundy thrown in. In phase one the lawn shape was changed to a more modern shape and most of the non-desirable plants were removed. New soil and plants were installed. Phase two will include a new upgraded fire pit, a new flagstone patio and a new flagstone walkway from the deck to the dock. Next year this garden will be really amazing!

jeff-viktor-garden-color

kenmore01 kenmore02 kenmore03

 

Please note that we’ve updated our newsletter format. You may navigate through this newsletter by clicking on the page numbers below.